Use this tool to plot a study or clinical-trial timeline and analyse it: how long tasks take, how many run at the same time, which tasks form the critical path, and whether the actual schedule ran over the plan. Upload your data below (CSV or Excel, or paste it) with one row per task, then press the button to generate the chart.
About the Gantt chart
A Gantt chart draws each task as a bar along a time axis, from its planned start to its planned end, so the whole project can be read at a glance. Tasks can be grouped into phases, milestones are tasks with the same start and end, and a reference line marks today or any other date.
When to use it
Use it to plan or report the timeline of a study, grant, clinical trial or thesis, to find which tasks control the finish date, and, if you also supply actual dates, to test whether tasks took longer than planned.
What this tool reports
A Gantt chart of the planned schedule, with phases, milestones and a reference line, and the actual dates overlaid when supplied.
Task durations and concurrency (how many tasks overlap).
The critical path with slack, calculated from the task dependencies you list.
Planned-versus-actual schedule performance, with tests of schedule overrun, when actual dates are supplied.
The figure and an APA 7 results paragraph with APA 7 tables, ready to download as Word, PNG, SVG or CSV.
Assumptions to check
Dates are consistent (day-first or month-first) and end dates are not before start dates.
Dependencies name other tasks exactly as written in the Task column, separated by semicolons.
The critical path assumes finish-to-start dependencies and no resource constraints.
How to report it in APA7
Report the planned project duration and critical path, the number of tasks and phases, and, if actual dates are available, the average overrun with its test statistic and p value. The tool writes this paragraph for you and lays out the tables in APA 7 style.
Frequently asked questions
Is the Gantt Chart Maker free?
Yes. You can run the analysis and read the results without an account. Create a free account or log in only when you want to download the results.
What columns do I need?
One row per task with Task, Start and End (dates or plain numbers such as weeks). Phase, Actual start, Actual end and Depends on are optional.
How do I show a milestone?
Give the task the same start and end value and it is drawn as a diamond.
Is my data uploaded to a server?
The analysis runs in your browser. Your data stays on your device while you use the tool.