Gantt Chart Maker with Schedule Analysis

Use this tool to plot a study or clinical-trial timeline and analyse it: how long tasks take, how many run at the same time, which tasks form the critical path, and whether the actual schedule ran over the plan. Upload your data below (CSV or Excel, or paste it) with one row per task, then press the button to generate the chart.

About the Gantt chart

A Gantt chart draws each task as a bar along a time axis, from its planned start to its planned end, so the whole project can be read at a glance. Tasks can be grouped into phases, milestones are tasks with the same start and end, and a reference line marks today or any other date.

When to use it

Use it to plan or report the timeline of a study, grant, clinical trial or thesis, to find which tasks control the finish date, and, if you also supply actual dates, to test whether tasks took longer than planned.

What this tool reports

Assumptions to check

How to report it in APA7

Report the planned project duration and critical path, the number of tasks and phases, and, if actual dates are available, the average overrun with its test statistic and p value. The tool writes this paragraph for you and lays out the tables in APA 7 style.

Frequently asked questions

Is the Gantt Chart Maker free?

Yes. You can run the analysis and read the results without an account. Create a free account or log in only when you want to download the results.

What columns do I need?

One row per task with Task, Start and End (dates or plain numbers such as weeks). Phase, Actual start, Actual end and Depends on are optional.

How do I show a milestone?

Give the task the same start and end value and it is drawn as a diamond.

Is my data uploaded to a server?

The analysis runs in your browser. Your data stays on your device while you use the tool.